Reference list
YEAR |
CLIENT |
LOCATION |
DESCRIPTION |
---|---|---|---|
2019 |
Dinnissen |
Sevenum (NL) |
Delivery vibratory conveyor for mulitple purpose, mobile and easy to clean |
2018 |
Everzinc | Luik (B) |
Delivery of AEG drives and electronics for overhaul of 5 vibrating conveyors |
2018 |
EOC |
Hoogeveen (NL) |
Filter maintenance |
2018 |
Omnicol | Weelde (B) |
Assignment to specify and realize an autonomous system for the 24/7 delivery of raw materials |
2018 |
De Ruwbouw Groep |
Harderwijk (NL) |
Drafting technical specification for stock registration of raw materials and semi-finished products |
2018 |
Ecolab | Nieuwegein (NL) |
Delivery 2 vibratory conveyors for dust-free transport of enzymes |
2018 |
IHB Quarzwerke |
Wilsum (D) |
Research new production activity |
2018 |
REVCO | Deil (NL) |
Disassembly mixing line liquids |
2017 |
Remix Droge Mortel |
Ellertshaar (NL) |
Quickscan zoning plans |
2017 |
Revontuli Techniek | Koog a/d Zaan (NL) |
Maintenance packaging line | 2017 |
ASB Grünland |
Bobitz (D) |
Ombouw van 2 productielijnen voor zowel volumetrisch verpakken van tuinaarde als gewogen verpakken van houtpellets. Levering nettoweger, schijventransporteur en zeef. Turn-key geleverd |
2017 |
PMF productions | Essen (B) |
Supply maintenance management software including implementation and training |
2017 |
Aircrete Europe |
Rosario (ARG) |
Managing installation assembly mixer installation |
2017 |
Remix Droge Mortel | Borger (NL) |
Quickscan permits |
2017 |
Aspen Pharma |
Oss (NL) |
Conductivity measurement for laboratory |
2017 |
Revontuli techniek |
Foxholl (NL) |
Maintenance packing line |
2017 |
Gunnebo |
Doetinchem (NL) |
Project support recycling residual concrete |
2017 |
Omnicol |
Weelde (B) |
Expansion for waste reduction |
2017 |
Revontuli techniek |
Zaandam (NL) |
Maintenance packing line |
2016/2017 |
Carboworld |
Deventer (NL) |
Adjustment of existing production line including software adjustments |
2016 |
Tarmac Blockplant |
Linford (UK) |
Re-start complete production site for cellular concrete |
2016 |
Sleurs |
Overpelt (B) |
Supply of mixers |
2016 |
VVM |
Rieme (B) |
Energy saving research |
2016 |
Revontuli techniek |
Wormer (NL) |
Maintenance small packing line |
2016 |
Revontuli techniek |
Foxholl (NL) |
Maintenance packing line |
2016 |
Omnicol |
Weelde (B) |
Planning, delivery and conversion remaining conveyor belts for capacity increase |
2016 |
IHB Quarzwerke |
Ibbenbüren (B) |
Feasibility study energy recovery |
2016 |
André Celis |
Lubbeek (B) |
Supply of mixers including control cabinets |
2016 |
Belgoprocess |
Dessel (B) |
Design and delivery test installation production and pumping immobilization mortar |
2016 |
CATO Engineering |
Arnhem (NL) |
Drawing assignment for gas storage gardener |
2015/2016 |
Omnicol |
Weelde (B) |
Planning, delivery and conversion conveyor for capacity increase including adaptation of construction mixing tower |
2015 |
AFS Schiphol |
Schiphol (NL) |
Supply and installation of kerosene conductivity measurement |
2015 |
G.P. Remkes |
Epe (Gld.) (NL) |
Supply maintenance management software including implementation and training |
2015 |
Omnicol |
Weelde (B) |
Supply of bulk cargo |
2014/2015 |
Aircrete Mexico |
Villa de Tezontepec(Mex.) |
Engineering and start-up concrete plant |
2014/2015 |
Belgoprocess |
Dessel (B) |
Design dry and wet mortar plant for the production of an immobilization mortar |
2014 |
Eurosalt |
Moerdijk(NL) |
Inspection and maintenance bagging machine and palletiser |
2014 |
Aircrete Europe |
Oldenzaal(NL) |
Preparing technical specification mixer tower both dry and wet handling and mixing |
2014 |
EOC |
Hoogeveen(NL) |
Replace filter systems for solids handling (supply and installation) |
2014 |
Revontuli Techniek |
Assendelft(NL) |
Dismantling and shipping palletizer from Netherlands to Congo |
2014 |
CATO engineering |
Arnhem(NL) |
Drawings a biogas plant |
2013 |
Gunnebo |
Doetinchem(NL) |
Supply maintenance management software including implementation and training |
2013 |
Omnicol |
Weelde(B) |
Command to optimize production |
2013 |
Marshal Quarry Products |
Hull(UK) |
Displacement dry mortar plant including modification, and expand direct bulk loading |
2013 |
Cementbouw (CRH) |
Tiel(NL) |
Inspection and repair of silo filters. |
2013 |
André Celis |
Lubbeek(B) |
Supply of dry mortar silo mixers and panels. |
2012 |
Carboworld Manufacturing |
Deventer(NL) |
Design of a new automatic bagging installation, including engineering support to improve the mixing process. |
2012 |
Remix Dry Mortar |
Fareham(UK) |
Review maintenance plan including specification of critical parts and check their availability. |
2012 |
VVM (CRH) |
Antwerpen(B) |
Design of fly ash dosing and blending installation within the existing production. |
2012 |
L’Anhydrite Lorraine (Knauf) |
Koenigsmacker(F) |
Project management for design and build of an installation for production of “micro gypsum”, within the existing facilities. |
2011 |
Diamant Beton |
Hardenberg(NL) |
Technical design and building permit for drying hall for concrete stones. |
2011 |
NRG |
Hamm(D) |
Modification production of recycling waste bread to include a magnetic conveyor belt. |
2011 |
Remix Droge Mortel |
Hardenberg(NL) |
Project management for complete overhaul of fluid bed drier (from Remix UK), and relocation to replace a rotary drier. Including environmental- and building permit. |
2011 |
Remix Dry Mortar |
Londen(UK) |
Prepare relocation of a dry mortar plant to the continent. Project management on site by KEMP. |
2011 |
ORION Beton |
Enschede(NL) |
Investigation of energy efficiency of the production plant. |
2011 |
Omnicol |
Weelde(B) |
Complete redesign of the ready mixed product to the bagging machines. |
2011 |
Omnicol |
Weelde(B) |
Design enlargement of raw material storage, improvement of additive dosing accuracy, including the supply of small additive weigh hopper. |
2011 |
Cementbouw (CRH) |
Tiel(NL) |
Supply and install filters for cement silos (including ship loading) |
2010 |
André Celis |
Lubbeek(B) |
Supply of dry mortar silo mixers and panels. |
2010 |
Remix Droge Mortel |
- |
Preparation of a potential new production location. |
2010 |
Profagus |
Bodenfelde(D) |
Performing quick scan of industrial production of charcoal and implementation of the suggested improvements. |
2009 |
Hendrix Illesch |
Beelitz(D) |
Supply and implement Maintenance Management software BOPV5. |
2009 |
Dycore (CRH) |
Hasselt(NL) |
Supply and install of silo filters including all safety equipment. |
2009 |
Remix Dry Mortar |
Bristol(UK) |
Modification of Loading chutes for truck loading including supply of all necessary equipment and automation. |
2009 |
Belgoproces |
Dessel(B) |
Preliminary design for dry mortar installation |
2008/9 |
Remix Droge Mortel |
Ellertshaar(NL) |
Modernization of mixing shop, 1st phase, and connection of packing line. |
2008 |
Remix Dry Mortar |
Gravesend(UK) |
Realisation of packing line. |
2008 |
Remix Droge Mortel |
Ellertshaar(NL) |
Realise packing line including soil sanitation and remediation, foundations and construction of the buildings needed and silo capacity. |
2007 |
Sakrete Droge Mortel |
Hardenberg(NL) |
Modernization of a dry mortar installation, doubling production capacity and expanding sand and finished product silos. |
2007 |
Mourik bouw |
Botlek(NL) |
Provide environmental and planning permit application for a mobile cement plant. |
2007 |
Remix Dry Mortar |
London(UK) |
Optimization of software for pneumatic mortar transport system. |
2006 |
Gunnebo Europe |
Doetinchem(NL) |
Delivery of silo protection and filter system for mortar transport system. |
2006 |
Remix Droge Mortel |
Ellertshaar(NL) |
Cost reduction by means of “peak-shaving” the gas consumption (savings EUR 25,000 per annum). |
2006/7/8 |
Remix Dry Mortar |
Gravesend(UK) |
Project to realise a complete new production location for dry mortar. |
2005/6 |
Remix Droge Mortel |
Ellertshaar(NL) |
Realisation of energy connections for electricity and gas (5 km trajectory). |
2005 |
Remix Dry Mortar |
Bristol(UK) |
Realisation of 2nd blower line for finished product. |
2005 |
ORION Beton |
Enschede(NL) |
Study on loading trucks in accordance with VDI 2700. |
2005 |
CMPE |
Safi (Marokko) |
Develop future vision on layout of factory and site. After stocktaking the situation on site and inventorying the needs (incl. adding a mixer installation), 2 complete proposals need to be worked out. |
2005 |
Remix Droge Mortel |
Ellertshaar(NL) |
Major maintenance of dryer installation. |
2004 |
Transport Beton Münsterland |
Südlohn(D) |
Making an old installation ready for production. The installation needs to be tested and training of personnel coordinated. In addition, both the technical and the environmental documentation needs to be updated. |
2004 |
Remix Droge Mortel |
Ellertshaar(NL) |
Installation of an extra silo for storage of dry sand. The rebuilding also included adjustment of the control system. |
2004 |
Diamant Beton |
Hardenberg(NL) |
Modernization of mixing shop at concrete brick factory, including replacement of the control system. |
2003 |
Remix Dry Mortar |
Londen(UK) |
Expansion of existing installation with 2 finished product silos. |
2003 |
Remix Dry Mortar |
Bristol(UK) |
Expansion of existing installation with separate storage and weighing system for the production of anhydrite. |
2002 |
Betoncentrale Rijnmond |
Rotterdam (NL |
Once the environmental permit had been issued, the complete construction of the plant was finished within a period of 4 weeks (including foundations!). The deadline for the 1st production was achieved exactly. The installation was then rounded off over 4 months during ongoing production. Capacity 100 M3 /hour. |
2001/2/3 |
Remix Dry Mortar |
Bristol(UK) |
Design and realisation of a complete dry mortar installation. The installation is equipped with an automatic additive and colouring dosage system. The entire project was fully supported; KEMP provided permanent support during the commissioning and technical acceptance. Capacity of installation 60 tonnes/hour. |
2001 |
Remix Droge Mortel |
Ellertshaar(NL) |
Replacement of sand dryer without that hampering production. The new dryer was realised alongside the old installation. The cutover took place during the company’s Christmas closing. Dryer capacity 100 tonnes/hour. |
2000 |
Betoncentrale Twenthe |
Doetinchem(NL) |
The cement plant needed to be modified for production of special cement for the “Betuwelijn”. The work consisted of examining the possible options and final realisation of the option chosen. |
2000 |
Betoncentrale Twenthe |
Hengelo(NL) |
Package selection for maintenance management package and support with implementation. |
1999 |
Betoncentrale Twenthe |
Doetinchem(NL) |
Replacement of entire control system for cement plant. A total production shutdown was finally limited to 2 days because the rebuilding started on Thursday evening and the installation was back in operation on the Tuesday following the weekend. |
1998/9 |
Remix Dry Mortar |
Londen(UK) |
Design and realisation of a compact dry mortar installation. Work consisted of drawing up an order specification, requesting offers, participating in the purchasing process, construction support, technical and capacity acceptance, training and after-care process. Capacity of the installation 35 tonnes/hour. |